总体降水方案(英文)_附件.docxVIP

  • 4
  • 0
  • 约1.14万字
  • 约 7页
  • 2018-07-16 发布于湖北
  • 举报
Project: Reem Island Sector 23 Shore Protection Works PAGE  China Harbour Engineering Co. L.L.C. SAFETY PLAN Method Statement for Dewatering (M.S. –005–2.0) China Harbour Engineering Co. L.L.C. MS-0052.017/03/2009R.N.RevisionSubmit. DatePrepared ByChecked ByApproved By General Introduction of Construction General Reem Island Development Sectors 2 3 Shore Protection Works has a total length of more than 6000 meters. The scope of work includes:Block Type Wall Structure、Shore Protection Wall Structure、Beach Works、Webbed L-Shaped Wall Structure(-3.25m、-2.5m)and can

文档评论(0)

1亿VIP精品文档

相关文档