外文翻译美国钢铁公司神户制钢冶金钢包的安装及运营精选.docVIP

外文翻译美国钢铁公司神户制钢冶金钢包的安装及运营精选.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
外文翻译美国钢铁公司神户制钢冶金钢包的安装及运营精选

Installation and operation of a ladle metallurgy facility at USS/Kobe Steel INSTALLATION of a ladle metallurgy facility (LMF) at Lorains continuous caster spanned 90 days from groundbreaking to the first successful heat of steel. The primary reason for this relative short installation and start-up time was the cooperation and communication between engineering, operating and maintenance departments, and the installation contractors. The Lorain facility, formerly a USS Div. of USX Corp., is now a joint partnership (50/50) between USS and Kobe Steel Ltd. The plant occupies 2.70 sq miles on the south side of the city of Lorain, Ohio, approximately 25 miles west of Cleveland, near Lake Erie. The plant is a primary source of bar products mostly directed at automotive and fastener industries as well as seamless and ERW pipe for oil country and other petrochemical applications. It has three operable blast furnaces (2 x 1500tons/day and 1 x 3600 tons/day), two 220-ton BOF vessels and a continuous caster. The caster produces a variety of cross-sections and steel grades for sourcing the plants finishing facilities as well as customers. Caster capacity is 750,000 tons/year, but it has already achieved 900,000 tons in a calendar year. The balance of the raw steel produced, approximately 2 million tons/year, is converted to 11-ton ingots which are rolled at the 46/40-in. tandem breakdown rolling and sizing mills. Finishing facilities include one 12-in. and one 10-in. bar mill for rounds rated at approximately 750,000 and 420,000 tons/year, respectively. Bar mill product ranges in.size from 0.464 to 3.0625 in. Tubular facilities include two seamless piercing mills producing product from 2 to 26-in. OD with a cornbined annual capacity of 540,000 tons and one ERW mill for product in the 2 to 6-in. OD range with an annual capacity of approximately 110,000 tons. Attempts to justify a buffer between the BOF and caster, whether a ladle furnace or a plasma torch heating unit had been

文档评论(0)

jjkk585 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档