High Pump Speed High Throughput Upper Limit 10 torr Low Operating Cost Moderate Initial Cost Small to Very Large Size No Oil Sealing Tolerates Particulates, Oxygen, Etchants Requires Mechanical Pump Critical Mechanical Tolerance Bearing Require Cooling and Lubrication Lower limit 10?? torr Noisy Fast Recovery from “Dumping” Fast Start-up Constant Speed Clean (no Oil) Low Operating Cost High Throuput Small to Large Size Sensitive to Particulates Requires Mechanical (Roughing) Pump High RPM (Noise/Vibration) Low Speed for Hydrogen and Helium High Maintenance Cost High Initial Cost High Speed