The permanent ship lock of Three Gorges Construction excavation and support of quality control Abstract: The permanent ship lock of Three Gorges ship lock for two-five consecutive total length of 6 442 m, one of the main section 1 637 m. Excavation of two phases: an excavation of a large area excavation to expose the top and South, the North Slope Excavation; two are mainly for the excavation of the main segment lock slot cut excavation. Support construction, including slope, chamber wall, supporting, mainly Anchor, anchor, spray concrete and other support method. Supervision by taking contr