- 2
- 0
- 约1.48万字
- 约 7页
- 2018-09-06 发布于湖北
- 举报
Purpose:
The purpose of this procedure is to ensure all risks associated with working at height within Department of Education and Early Childhood Development (DEECD) workplaces are identified and managed.
Scope:
This procedure applies to all tasks that require working at a height which are performed in DEECD workplaces including schools and central/regional offices.
References:
Occupational Health and Safety Act 2004
Occupational Health and Safety Regulations 2007
Prevention of Falls in General Construction Compliance Code; Edition 1: September 2008
AS1562.1:1992- Design and installation of
您可能关注的文档
- Presentazione di PowerPoint - Scienza e Tecnologia dei Materiali精品分析.ppt
- Plasma Cleaning of Surfaces_en精品分析.doc
- Project Charter Sample精品分析.docx
- Research and Technological Development in the Cement and Concrete精品分析.ppt
- OMG Tutorial - Session 2精品分析.ppt
- RUSSELL KIRKLAND - University of Georgia精品分析.doc
- Safety Management System (SMS) Handbook精品分析.doc
- Save all Life in the World - of man and bird and beast精品分析.doc
- Road Network Improvement Project Cost Management and Control of the whole process of精品分析.doc
- SELF-GUIDED GRADUATE TOUR WELCOME TO PENN LAW!精品分析.doc
原创力文档

文档评论(0)