三峡大坝资料(Data of the Three Gorges Dam).doc

三峡大坝资料(Data of the Three Gorges Dam).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三峡大坝资料(Data of the Three Gorges Dam)

三峡大坝资料(Data of the Three Gorges Dam) Data of the Three Gorges Dam In April 3, 1992, the five session of the seven National Peoples Congress adopted the resolution on the construction of the Three Gorges project, which attracted the attention of the whole world. The Three Gorges water control project of the Yangtze River is the largest water control project in the world, and has been listed as one of the global super projects. The Three Gorges dam is located in the middle of Xiling gorge, 38 kilometers upstream of Gezhouba Dam. The dam is a concrete gravity dam, crest length 3035 meters, crest elevation 185 meters, the normal water level of 175 meters, a total capacity of 39 billion 300 million cubic meters, of which 22 billion 150 million cubic meters of flood control capacity. Sediment discharge per second is 2460 cubic meters. The desilting holes are dispersed in the gravity dam section and the bottom of the power plant. The discharge capacity of the flood discharge dam is 110 thousand cubic meters per second. The hydropower plant is located at the left and right sides of the flood dam, with a total installed capacity of 700 thousand kilowatts, a total capacity of 18 million 200 thousand kilowatts, and an annual output of 84 billion 700 million kwh, with a total installed capacity of 26 kilowatts. The navigation structure on the left bank has a one-way capacity of 50 million tons per year, and the double line E class locks can pass through the fleet of 100 ton tonnage, single line vertical ship lift, and can pass through the freight and freight wheels of 3000 ton class. The Three Gorges project is a key project in many comprehensive measures to solve the serious flood threat in the middle and lower reaches of the Yangtze river. After completion of the project, the Yangtze River Jingjiang River flood control standard from the current ten years increased to a hundred years, can greatly reduce the threat of floods in the Yangtze river. After the completion of the Thr

文档评论(0)

beoes + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档