- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
w
外文原文
Surface settlement predictions for Istanbul Metro tunnels
excavated by EPB-TBM
S. G. Ercelebi ? H. Copur ? I. Ocak
Abstract In this study, short-term surface settlements are predicted for twin tunnels, which are to be excavated in the chainage of 0 ? 850 to 0 ? 900 m between the Esenler and Kirazl? stations of the Istanbul Metro line, which is 4 km in length. The total length of the excavation line is 21.2 km between Esenler and Basaksehir. Tunnels are excavated by employing two earth pressure balance (EPB) tunnel boring machines (TBMs) that have twin tubes of 6.5 m diameter and with 14 m distance from center to center. The TBM in the right tube follows about 100 m behind the other tube. Segmental lining of 1.4 m length is currently employed as the final support. Settlement predictions are performed with finite element method by using Plaxis finite element program. Excavation, ground support and face support steps in FEM analyses are simulated as applied in the field. Predictions are performed for a typical
geological zone, which is considered as critical in terms of surface settlement. Geology in the study area is composed of fill, very stiff clay, dense sand, very dense sand and hard clay, respectively, starting from the surface. In addition to finite element modeling, the surface settlements are also predicted by using semi-theoretical (semi-empirical) and analytical methods. The results indicate that the FE model predicts well the short-term surface settlements for a given volume loss value. The results of semi-theoretical and analytical methods are found to be in good agreement with the FE model. The results of predictions are compared and verified by field measurements. It is suggested that grouting of the excavation void should be performed as fast as possible after excavation of a section as a precaution against surface settlements during excavation. Face pressure of the TBMs should be closely monitored and adjusted for different zones.
Keywords Sur
您可能关注的文档
- 韩立敏-产后出血-.ppt
- 汉语言文学专业毕业论文--浅谈陶渊明的田园诗.doc
- 杭州—绿城丽江公寓.ppt
- 航空礼仪规范培训-.ppt
- 合成红宝石工艺及鉴别论文.doc
- 和孩子共同成长吕琢-.ppt
- 合同法律审核-.ppt
- 河北省机电产品出口贸易现状及发展研究论文.doc
- 浩润终端净水项目推介5-20-.ppt
- 红领巾相约中国梦-.ppt
- 外文翻译--基于混合信号的数据采集卡的虚拟示波器(适用于毕业论文外文翻译+中英文对照).doc
- 挖掘作业基础知识-.ppt
- 外文翻译--基于神经网络和遗传算法的模糊系统的自动设计(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--简易合成易回收的分层核壳Fe3O4@MgAl–LDH@Au磁性纳米粒子催化剂催化氧化醇类物质(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--旅游路线及管理系统(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--气候条件对地源热泵系统性能的影响(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--密封的建筑排水系统和通气系统—活性气压的瞬变控制和抑制(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--数字图像处理方法的研究(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--天线的性能(适用于毕业论文外文翻译+中英文对照).doc
- 外文翻译--塔式复合人工湿地处理农村生活污水(适用于毕业论文外文翻译+中英文对照).doc
原创力文档


文档评论(0)