地下连续墙施工质量的要点分析

地下连续墙施工质量的要点分析   摘要:东莞市快速轨道交通R2线【2310标】土建工程的工程范围为二站二区间【珊美站、寮厦站、陈寮矿山法区间、寮珊盾构区间】,工程造价约6.0亿,其中【珊美站】和【寮厦站】为明挖顺做法施工车站,其围护结构采用地下连续墙+内支撑结构。      关键词:地下连续墙;施工质量;要点分析   Abstract: The city of Dongguan rapid rail transit line R2 [ 2310 ] and civil engineering project scope for two station two interval [ Shan Mei station, Liao Xiamen station, Chen Liao, Liao Shan mining method of interval shield interval ], the cost of about 600000000, of which [ Shan Mei station ] and [ station ] for open-cut Mailiao ha the practice of construction station, the envelope of the underground continuous wall and interna