关于大口径双排平行顶管施工措施的探讨   摘要:简要探讨了大口径双排平行顶管施工技术措施,通过计算确定双排平行钢管顶管的中心间距和错位纵距,保证了施工过程中两排顶管无不良影响。通过对顶进测量及沉降等控制,保证了顶进工作的顺利进行。   关键词:顶管;施工技术措施   Pick to: briefly discusses the large diameter double row parallel pipe jacking technology measures, through the calculate and determine the double row parallel steel tube of pipe jacking center spacing and longitudinal displacement from the guarantees the construction process two rows of pipe jacking without adverse effects. Through the survey and the settlement of into the control, and to ensure the top into work smoothly.   Key words: top tube; Constructi