阀门规格SPECIFICATION-OF-2ND-LOTS.pdfVIP

  • 14
  • 0
  • 约2.5万字
  • 约 8页
  • 2018-10-13 发布于江苏
  • 举报
Section VI – Schedule of Requirements 88 LOT NO. 2 ‒SUPPLY OF VALVES, HYDRANTS, COUPLINGS AND ACCESSORIES 3. PARTICULAR REEQUIRMENTS FOR LOT NO. 2 3.1 Item B.1 ‒ Gate Valve The following particular requirements are specified for the following items: Line Physical Description of Goods Quantity Item No.

文档评论(0)

1亿VIP精品文档

相关文档