CIMA商业精英国际挑战赛冠军队伍PPT.docxVIP

CIMA商业精英国际挑战赛冠军队伍PPT.docx

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CIMA商业精英国际挑战赛冠军队伍PPT

CIMA 英国皇家特许管理会计师公会 (Chartered Institute of Management Accountants) T. 400 820 4080 E. gbc.china@ Web. CIMA Global Business Challenge 2014 CIMA 2014 商业国际精英挑战赛 THE CASE CONCERNING CERTAIN ISSUES FACING MERBATTY The report is prepared by Team: AMIC5 From: Huazhong University of Science and Technology, School of Management Team member Team leader: Zou Qi 邹琦 Team member 1: Shao Mingxia 邵明夏 Team member 2: Liu Chen 刘琛 Team member 3: Wang Liran 王丽然 Content 1 Introduction 2 Terms of reference 3 Identification and prioritization of issues 4 Discussion of issues 5 Ethical issues 6 Recommendations 7 Conclusions Appendix 1 SWOT analysis 2 PEST Analysis 3 Porter’s Five Forces Analysis 4 Mendelows Matrix 5 Ansoff Matrix 6 Financial Performance Indicators 7 Forecasted Cash Available For Investment at 31 Dec 2013 8 Cash Flow?Difference?between Two Hull Suppliers 9 The Breakeven Sales Volume of Racing Boat Proposal Introduction Established in northern Europe 33 years ago, Merbatty now is a world renowned builder of luxury boats which became listed in November 2012. It has enjoyed rapid growth in sales for the last 12 years and has recently reached a global market share of around 8%. Confronted with the increasingly competitive market, Merbatty is supposed to deal with several issues which would hinder its current operations and the planned expansion. A number of problems and incidents need consideration and analysis in order to achieve Merbatty’s five-year plan. Terms of Reference The report is designed to prioritize, analyze and evaluate the issues facing the board of Merbatty. Detailed recommendation is made where appropriate. Identification and prioritization of issues Priority Issue Strategic W1 Acceptability W2 Impending W3 Total Priority 1 5 0.4 5 0.4 4 0.2 4.8 1 2 3 0.4 3 0.4 5 0.2 3.4 3 3 3 0.4 2 0.4 2 0.2 2.4 6 4 4 0.4 2 0.4 3 0.2 3 4 5 2 0.4 4 0.4 2 0.2 2.8 5 6 4 0.4 4 0.4 5 0.2 4.2 2 Issue Strategic Acceptability

文档评论(0)

专注于电脑软件的下载与安装,各种疑难问题的解决,office办公软件的咨询,文档格式转换,音视频下载等等,欢迎各位咨询!

1亿VIP精品文档

相关文档