摘要
And it verifies the feasibility of the optimization results.
Based on the analysis of the boom, the optimization scheme of the overall structure
of pipe crane was proposed. This scheme was primarily achieved by optimizing the
boom weight and changing location for the hydraulic winch of the pipe crane installing.
As the location of the hydraulic winch changing, a simple optimization on the
counterweight device was also done. Without
您可能关注的文档
最近下载
- 预发泡珠粒的熟化.pptx VIP
- jelq法-锻炼教程珍藏版全集.pdf VIP
- 第一单元 新闻联读(大单元教学课件)语文统编版2024八年级上册.pptx
- 老人70岁以上考驾照三力测试题(附答案).pdf VIP
- 陕旅版(新教材)小学英语五年级上册全册各单元每课时教学设计汇编(含24个教学设计).pdf
- 房屋建筑工程设计概算编制规程.docx VIP
- 塑料成型工艺及模具.ppt VIP
- eps泡沫生产工艺技术.pptx VIP
- Stylistic Features of News English 论新闻英语的文体特征.doc VIP
- 英语文体学论文Stylistic Analysis of News Report.doc VIP
原创力文档

文档评论(0)