- 1、本文档共69页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大功率变流器中快速熔断器的设计分析与选型-电气工程专业论文
ABSTRACT
The International Thermonuclear Experimental Reactor (ITER) program is of great importance to achieve controlled nuclear fusion and to solve the energy crisis of the human society, up to now, China, USA, European Union, Russia, Japan, Korea and India have been involved in this program. ITER Poloidal Field (PF) converter power supply system procurement package is mainly borne by China. PF converter is power supply for ITER poloidal magnet, which plays a crucial role in plasma shape control. Thus, the reliability and the safety of PF converter are very important for ITER. The main circuit of PF converter is a typical twelve pulse thyristor rectifier, to guarantee the reliability and the safety of the converter, the semiconductor switches must be protected effectively. In semiconductor rectifier protection, three kinds of protection are usually combinedly used, they are electronic protection, fuse protection and circuit breaker protection. Fuse protection is the primary protection of semiconductor switches. PF converter has high rated power and hundreds of thyristors in parallel, the structure is complex and its running mode changes with time. Thus, high reliability is needed for the fuse protection.
In this paper, the design of fuse protection and selection of fuse for high power converters are researched according to the characteristics of PF converter, combining with the protection requirements.
In this paper, a set of fuse protection design is put forward based on the basis of the fuse protection, IEC standards and engineering experience, mainly including fast fuse pre-selection and performance verification. First, the rated parameters of fuse is selected, focusing on selecting rated current. Then fuses performance is verified, mainly including its protection performance for thyristor and the performance of cooperating with the circuit breaker. In the verification process, all possible failures of the converter are analyzed, fault circuit models are buil
您可能关注的文档
- 单模光纤中受激布里渊散射阈值的研究-光学工程专业论文.docx
- 单模表面浮雕结构垂直腔面发射激光器的特性研究-物理电子学专业论文.docx
- 单次和多次冷晶体血灌注在未成熟心肌保护临床研究-外科学专业论文.docx
- 单次足浴对青年和老年女性动脉硬度的影响-运动人体科学专业论文.docx
- 单次鼻腔给予胰岛素对异丙酚引起的tau蛋白过度磷酸化影响的实验分析-神经病学专业论文.docx
- 单模光纤中一阶偏振模色散及极化相关损耗统计特性研究-通信与信息系统专业论文.docx
- 单次喷射测量仪的控制系统研究-机械工程专业论文.docx
- 单比特接收机自适应波束形成、同步算法研究及工程实现-信号与信息处理专业论文.docx
- 单气囊小肠镜与胶囊内镜应用初体会-内科学(消化内科学)专业论文.docx
- 单活性中心催化剂催化烯烃聚合研究-高分子化学与物理专业论文.docx
文档评论(0)