吸收塔施工技术方案(倒装法)

目 录 1.工程概况··································································1 2.编制依据··································································1 3.作业前地条件和准备························································3 4.作业地程序和方法··························································6 5.质量控制点地设置和质量通病及预防··········································16 6.作业地安全要求和环境条件··················································18 7.执行工程建设标准强制性条文地相关条文······································22 8.附录······································································24 1.工程概况 工程概况 虎山电厂烟气脱硫工程脱硫装置采用石灰石——石膏湿法工