东方华府楼临时用电策划案
浙江城建建设集团有限公司 西宁东方华府21、22号商住楼临时用电施工方案
PAGE 1
PAGE 21
目 录
一、编制依据·············································1
二、工程概况·············································1
三、主要施工用电设备·····································2
四、临时用电总体方案······································3
五、纵筋线计算和变压器选择······························4
六、配电布置及施工方案···································6
七、各支路计算书········································8
八、配电导线选择及电器选择·······························18
九、安全用电技术措施·····································22
十、防雷接地的设计······································40
十一、电气防火措施······································40 TOC \o 1-3 \h \z \u
一、 编制依据
1.1 《施工现场临时用电安全技术规范》(JGJ46-2005);
1.2 西宁东方华府21#、22#楼工程施工图;
1.3 西宁东方华府21#、22#楼工程施工组织设计;
1.4 西宁东方华府21#、22#楼工程施工现场平面布置图;
1.5 《建筑施工计算手册》(2001年版);
1.6 青海省及西宁市对施工现场临时用电要求.
二、工程概况
本工程为西宁东方华府住宅小区临街的商业与住宅为一体的高层现代化住宅楼,其建筑面积47552.37m2.地下二层,地上三十四层,其中群楼三层,主楼三十一层,建筑总高度99.60m.工程北临夏都大道,西侧与东方华府23号楼连为一体,东侧为待建的东方华府19、20号楼,南侧为居民区.
在施工现场东北角建设单位提供500KVA的箱变,作为施工现场临时用电以及工程完工后商住楼内供电.
设计单位:青海省建筑勘察设计研究院;建设单位:青海新千房地产开发有限公司;监理单位:甘肃省教育工程建设监理公司青海分公司;施工单位:浙江城建建设集团有限公司西宁分公司.
主要施工用电设备
21#楼主要施工用电负荷机械一览表(支路1--支路7用电设备)
序号
设备名称
规格、型号
单位
数量
单机容量单位KW
总计P
单位KW
1
塔吊
QTZ80(ZJ5710)
台
1
35
35
2
人货电梯
SCD200/200
台
1
36
36
3
砂浆搅拌机
HJ200-B
台
1
12
12
4
砂浆搅拌机
1
9
9
5
钢筋切断机
CQ40-1
台
2
4
8
6
钢筋弯曲机
GWJ-40A
台
2
4
8
7
钢筋弯曲机
8
砂轮切割机
1
2
2
9
木工电锯
台
2
3
6
10
木工电刨
台
1
3
3
11
插入式振动器
HZ-30
台
13
镝灯
盏
2
3.5
7
14
施工照明
14
15
生活用电
2
16
电焊机
BX3-500
台
3
10.5
31.5
17
电渣压力焊机
BX3-500-2
台
2
24
48
18
对