网站大量收购独家精品文档,联系QQ:2885784924

工程量清单模式下矿建工程计价方法应用研究-采矿工程专业论文.docx

工程量清单模式下矿建工程计价方法应用研究-采矿工程专业论文.docx

  1. 1、本文档共68页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程量清单模式下矿建工程计价方法应用研究-采矿工程专业论文

Subject : Study on the Project Pricing method of Colliery Construction under the Bill of Quantities Mode Specialty : Mining engineering Name : Zhang Yinhuan (Signature) Instructor : Li Longqing (Signature) ABSTRACT The process of construction project rose spirally with the rapid development of national economy; governments at all levels had devoted much more manpower, material and financial resources to mine construction engineering. But the shortage of mine construction funds is becoming a bottleneck for project construction and progress. Thereby, mine construction engineering cost management is turn into an important research topic in engineering construction field. Project pricing is a premise for engineering cost control, only ensure the timeliness and accuracy of project pricing at investment decision stage, the occurrence of engineering cost will be seized effectively in the process of cost management, and the investment and social benefits will be heightened, mean while, the loss of fixed assets investment will be depressed. The project pricing method of colliery construction, which receives many experts and scholars’ much concern in recent years, is investigated and researched in the paper, then, the fuzzy CBR (Case-based Reasoning) method, which suitable for mine construction engineering, is elicited. The fast pricing system based on fuzzy CBR method includes the constitution of partial consumption subsystem and the creation of comprehensive unit price. And the principle, steps and implementation strategies of CBR is discussed in detailed; the concept, framework and representation of standard case are proposed. Main characteristic factors for the estimation of engineering similarity are analyzed; the judgment matrix of similarity degree and the consistency test method are structured, then, the most resembling case with drafting project is searched in case base, and the consumption of manpower, materials and equipment for drafting project is obtained, t

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档