川东北高含硫气田宣汉开县区块气田工程 CDB High Sour Kai/Xuanhan Block Gas Field Project 硫磺厂施工临时用电规划 Arrangement Proposal of Construction Temporary Power for Sulfur Plant Document. No. : CDB-0000-TEC-PLN-SC2-000-00052-00 U01 2011.1 For construction Wang Jianhui Zhang Yu He Yuanshen REV DATE DESCRIPTION ORIG CHK APPR APPROVED BY: COMPANY APPROVAL: He Yuanshen DATE: 2011.1 DATE: Document Control No. Project Area Discipline Type Originator Package Sequence-Sht Rev. CDB 0000 TEC PLN SC2 000 00052-00 U01 CDB-0000-TEC-PLN-SC2-000-00052-00 川东北高含硫气田工程 Chuandongbei High-Sulfur Gas Field Project 硫磺厂施工临时用电规划 Temporary Power Plan for Sulfur Plant Construction 川庆油建公司川东北高含硫气田工程施工项目部 SPC Chuandongbei High-sulfur Gas Field Project Construction Department 版次 编制COMPILED 日期 DATE 2010-12-28 Rev. 审核REVIEWED 日期 DATE 2010-12-28 U01 批准APPROVED 日期DATE 2010-12-28 硫磺厂施工临时用电规划 Arrangement Proposal of Construction Temporary Power for Sulfur Plant 目 录 Contents 1. 工作范围SCOPE OF WORK1 2. 相关活动和方案RELATED ACTIVITIES METHOD STATEMENTS1 3. 健康、安全与环境HEALTH 、SAFETY ENVIRONMENTAL 1 3.1. 风险识别 RISK IDENTIFICATION 1 3.2. HSE 要求 HSE REQUIREMENTS 1 3.

文档评论(0)

1亿VIP精品文档

相关文档