网站大量收购独家精品文档,联系QQ:2885784924

基于ahp的铁路工程施工阶段风险预警管理研究-项目管理专业论文.docxVIP

基于ahp的铁路工程施工阶段风险预警管理研究-项目管理专业论文.docx

  1. 1、本文档共58页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基于ahp的铁路工程施工阶段风险预警管理研究-项目管理专业论文

Research Research on risk early warning management of railway engineering construction stage that based on AHP Abstract Along with the development of social economy,traffic in people’S lives occupy an increasingly large proportion,people demand for convenient transportation becomes more and more,especially for long distances,for railway traffic convenience denmd more exuberant.But with the railway construction project increasingly large scale,its complexity increases,increasing the risk factors on railway engineering project construction stage ah,increased probability of occurrence of the risk,to the construction enterprise and the project participants brought many losses,hinder the smooth progress of the construction,and for most of the construction enterprises,risk awareness is relatively weak,poor risk management,lack of risk on the construction of an early warning of risk management,in an unknown state,more students and personnel loss caused by the railway construction project risk casualties,therefore,the index system on the basis of risk the railway project encountered in the construction phase of construction of a risk warning,risk of construction stage to achieve a warning effect,The project management risk happens to risk have a predictable state, thus the risk occurred ahead of time to do a full preparation,reduce the probability of risk occurrence and reduce the risk of the project resulted in a loss and personnel casualties. First,this article makes a thorough analysis and Research on the railway project and its characteristics,and then carry out the identification and analysis of risk characteristics of the railway engineering project may encounter in the construction phase of the impact of the risk on the construction stage of the railway project from the internal and external factors were classified and analyzed. and the IUsk Breakdown Structure stratification of railway engineering project risk factors in construction stage;the second is based on

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档