网站大量收购独家精品文档,联系QQ:2885784924

宁德核电高路堤桥台ptc桩网处理深厚软基工程的研究-建筑与土木工程专业论文.docxVIP

宁德核电高路堤桥台ptc桩网处理深厚软基工程的研究-建筑与土木工程专业论文.docx

  1. 1、本文档共166页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
宁德核电高路堤桥台ptc桩网处理深厚软基工程的研究-建筑与土木工程专业论文

优秀毕业论文 精品参考文献资料 宁德核电高路堤桥台PTC 宁德核电高路堤桥台PTC桩网处理深厚软基工程的研究 Abstract IIl Cllin钆road construction continues to extend to me coastal area,more and more need to build a foundation and abutments on soft deep silt layer.Due to poor geological conditions, soft foundation treatment iS di伍cult,such as roadbed subsidence slip,realabutment jumping and other issues fiequently. In recent years,vacuum preloading of soft ground method is widely used,in recent years, vacuum preloading of soft ground method iS widely used.but because of long construction period.a large settlement after construction is completed,the road iS not suitable for abutment soft foundation treatment,often in place of pile net composite foundation treatment.Pile net composite foundation supported embankment is still in the research phase of the trial, immature theory,engineering design and construction require further study,research for practical problems encountered in engineering and solving methods is especially lacking. In this article,theory of soft foundation treatment method and pile net composite foundation were introduced and summari.zed firstly,lay the foundation for later study and solve problems.then.The problem of construction of PTC pipe net composite foundation supported embankments on soft ground has been studied in Ningde nuclear electricity road, and the soft ground conditions are subject to perennial water immersion,surface floating silt thick,deep mud,carrying capacity low.The main contents are as follows:first,analyzed the reasons of slip and sinker of pile net composite foundation supporting embankment in the above conditions,the main reason is the flow of soil between piles around and insufficient carrying capacity,as well as internal friction angle of subgrade filling is smaller.Second, researched the treatment OVer piled embankment subsidence instability,used the hi【911 pressure spraying pile reinforcement,and achieved good results.Third,optimized design for nle construction of PTC pipe

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档