百灵110kv智能变电站设计方案电子与通信工程专业论文

百灵I 百灵I 10kV智能变电站设计方案 SF6环境监测,时间同步等系统。主变压器继电保护采用主、后分开的微机型保 护,110kV线路侧设有各自投装置一套;10kV线路、电容器和站用变选用微机 型保护。 通信设计包括系统通信和站内通信的设计。系统通信采用光纤通信,架设1 条24芯OPGW光缆,接622Mb/s光口,配置1套容量为2.5Gb/s SDH光传输设 备,2套PCM基群设备。站内设一套接入式交换机(GE口),并装设电话机。 关键词:智能变电站;一次设备;过程层;间隔层;站控层 万方数据 内蒙古大学硕士学位论文DESIGNING 内蒙古大学硕士学位论文 DESIGNING SHCEⅣ匝OF THE BAILING 1 l OkV INTELLIGENT SUBSTATION AB STRACT The construction of the smart grid plays an important strategic role in promoting China’S social economy development and adjusting economic restructuring etc.. Intelligent substation is an essential part of the smart酊d.In this thesis,a l l 0kV substation intelligent building program is designed to upgrade the rural power grids of the Inner Mongolia Erdos City Hangj inqi,which includes the designing of the overall system,the selection of the equipment,and the proj ect of the communication designing. The system design includes:an access system to choose a double-circuit leading from a 1 1 0kV generatrix which is from other transformer substations;outgoing line system planning a twice 1 1 0kV outgoing line and 20 times 1 0kV outlet; implementing two-level scheduling management of the Ordos district and the Hangj inqi;the collection and transmission of the information within all remote stations completed by the remote workstation of the microcomputer monitoring system;setting up a remote monitoring system for security. The primary Equipment building program:programming and construction of two 63MVA double winding OLTC main transformers,1 1 0kV distribution equipment with whole sets of GIS indoor devices;the short-circuit electric current 1 1 0kV device setting as 40kA,1 0kV equipment setting as 3 1.5kA;1 1 0kV electrical primary equipment using indoor SF6 gas-insulated metal—enclosed switchgear(GIS),1 0kV III 万方数据 百灵l 百灵l IOkV智能变电站设计方案 using switch cabinet;Cockpit laying cable with cable channel;lighting power connecting a 3 80/220V power distribution equipment. The secondary equipment building program:process level(co

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档