ce5108envexc敏avationatscottroad.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ce5108envexc敏avationatscottroad

Plaxis Input Parameters UMC and LMC Strength and Stiffness increase linearly with depth Struts at 8.5 m cc Sheet-pile wall FSP IV * Construction Stages Model NO Preloads Strutting and next excavation level can be modeled in one single stage * GWT Model by Steady-State Seepage * Low k in UMC keep GWT from dropping, so SS Seepage is OK for this Case Limit Equilibrium Model using CADS Piled-Wall Suite * * * EXC -3.7m * EXC -5.1m * EXC -7.5m Maximum Lateral Deflection * Wall Bending Moment Final Stage of Excavation * Development of Field Strut Forces * Strut Forces at Level 1 (-0.8m) * Strut Forces at Level 2 (-2.5m) * Strut Forces at Level 3 (-4.5m) * Apparent Earth Pressure Diagrams * Conclusions LE solutions in modelling indeterminate multi-propped system were unable to predict reasonable estimates in terms of wall lateral deflection, wall bending moment and strut force In short, LE method should not be used when handling indeterminate multi-propped system FE predictions, on the other hand, are able to do so and its results are quite indicative of the field values Peck’s empirical earth pressure diagram(1969) is a suitable method for estimating strut loads for design. Moreover, it is a simple and quick hand calculation method * FOS vs Displacements Global FOS = 2.0 by c/phi reduction analysis; for elastic wall But at FML of 7.5m Wall deflects 400 mm; Is this failure?? NO in terms of collapse, BUT YES in terms of Serviceability limit * Basal Heave Analysis Use Bjerrum and Eide method: H=7.5m, B=30m, Clay wt. g = 16 kN/m3, cu=20 kPa, Nc=6.0 FOS = Nc * cu / (g*H) = 6*20/(16*7.5) = 1.0 imply that wall would nearly fail by basal heave? Why did wall not fail? Use Terzaghi Method: Obviously, the wall socket into Clayey Sand below the LMC prevented basal heave failure Also the flexure capacity of the wall add to the FOS against basal heave failure * Basal Heave Analysis * FOS for basal heave 1; so expect large wall deflection and large strut loads Bolton MS

文档评论(0)

135****1071 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档