地铁车站设备磨合期需求分析.docVIP

  • 5
  • 0
  • 约3.4千字
  • 约 3页
  • 2019-02-20 发布于河北
  • 举报
地铁车站设备磨合期需求分析 摘要在轨道交通设备运营上设备运行的稳定性是一个关键问题尤其在部分城市地铁运营扶梯事故等事件出现后如何保证直接服务于乘客的地铁车站设备运行稳定日益得到关注本文试从地铁设备的磨合期来分析此问题。 关键词地铁磨合 中图分类号 u231.4 文献标识码a文章编号 abstract: in the rail traffic equipment operation equipment operation stability is a key problem especially in parts of the city metro operation after the event such as escalators accident how to guarantee in the service of the passengers directly subway station equipment operation stability is getting attention this paper tries to analyze the subway equipment period of this problem. key words: the subway bond 磨合期一般指机械零部件在初期运行中接触、摩擦、咬合的过程。现代多用于形容两件事物或组织

文档评论(0)

1亿VIP精品文档

相关文档