PAGE PAGE IV Abstract With the economic increasing, and railway highway and water conservancy project getting to be deep-buried, surrounding rock stability of deep buried tunnel becomes important factors , and it restricts the progress of the project. It takes Jinping II Hydropower Station as research background of the project, and taking the deep research of failure mechanism of deep-buried hard rock ( marble) at this hydropower station as the core purpose. Based on the research of the mechanism of rock burst ,have research about prediction and protection method of rock burst. Mainly inclu