- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
JIT库存管理策略和精益生产外文翻译
外文翻译
原文
Just-In-Time Inventory Management Strategy Lean Manufacturing
Material Source://0.
Author:David Broyles, Jennifer Beims, James Franko, Michelle Bergman
Overview of Just-in-Time Inventory Management?
Just-in-time is a movement and idea that has gained wide acceptance in the business community over the past decade. As companies became more and more competitive and the pressures from Japans continuous improvement culture, other firms were forced to find innovative ways to cut costs and compete. The idea behind JIT, or lean manufacturing, is to have the supplies a firm needs at the exact moment that they are needed. In order to accomplish this goal a firm must constantly be seeking ways to reduce waste and enhance value. A recent survey of senior manufacturing executives showed that 71% used some form of JIT in their processes Pragman. This simple statistic illustrates that JIT is here to stay and also that firms must constantly be searching for ways to cut costs and achieve an advantage. JIT is one way to achieve that end resultIn order to understand how JIT works a common vocabulary needs to be established from which to further discuss the topic and gain insight into why so many firms have adopted it. As previously stated, one of the key components of JIT is to reduce waste and add value. There are several activities that a company must monitor as targets for reducing waste. Among these are, excessive waste times, inflated inventories, unneeded people or material movement, unnecessary processing steps, numerous variabilities throughout a firms activities and any other non-value adding activity. A key example of this is a new plant that Caterpillar is bringing on-line in the near future. By reducing the number of times a bucket had to be repositioned while it was being welded, Caterpillar was able to reduce the amount of time the bucket spent in the welding line, reduce labor costs by limiting idle time at the weldin
您可能关注的文档
- D-Link DI-524M路由器设置步骤.doc
- DLP(双灯)大屏幕显示系统技术方案.doc
- Dreamweaver实例教程第4章.ppt
- DSC PC585简易编程手册.doc
- DSN逆止器选用手册020602.doc
- DWDM培训原理教材.doc
- EDA技术实验指导书2011.doc
- EDA技术与Verilog_HDL(潘松)第四章与第六章课后习题答案.ppt
- EDA数字钟(Quartus II)实验报告.doc
- EIN_店铺服务标准和规范.ppt
- 2025年内蒙古公务员考试《人文科技常识》必刷100题试卷带解析(全优).docx
- 2025年天津市公务员考试《人文科技常识》必刷100题试卷带解析带答案ab卷.docx
- 2025年国家公务员考试《人文科技常识》试卷带解析必背含答案.docx
- 2025年安徽省《人文科技常识》必刷100题试卷带解析带答案(最新).docx
- 2025年吉林省《人文科技常识》必刷100题试卷带解析含完整答案【各地真题】.docx
- 河北省石家庄市2025届普通高中毕业年级教学质量检测(二)数学试卷(解析版).docx
- 湖北省武汉市5G联合体2023-2024学年高一下学期期末考试数学试卷(解析版).docx
- 湖北省鄂州市2025届高三下学期一模数学试卷(解析版).docx
- 河南省商丘市商师联盟2023-2024学年高二下学期期中联考数学试卷(解析版).docx
- 湖北省华大新高考联盟2025届高三下学期3月教学质量测评数学试题(解析版).docx
最近下载
- 人教版二年级下册数学计算题专项练习1500题带答案.docx VIP
- 虚拟语气专项练习(附答案).docx VIP
- 深入了解胰岛素PPT课件.pptx
- GB_T 4728.2-2018电气简图用图形符号 第2部分_ 符号要素、限定符号和其他常用符号.pdf
- 蒸压加气混凝土板轻质隔墙施工方案ALC板、NALC板.docx
- 一年级下册道德与法治课件-第2课《我们有精神》第2课时说课人教版.ppt
- 2020 生态环境保护隐患排查治理工作规定.doc
- 《高血压危象护理》课件.pptx VIP
- 《GBT 13894-2023石油和液体石油产品 液位测量 手工法》最新解读.pptx
- 基于改进粒子群算法的光伏逆变器控制参数辨识.docx VIP
文档评论(0)