- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
本科毕业论文(设计)外文翻译
施工项目进度控制的关键问题
院(系、部)名 称 :
专 业 名 称:
学 生 姓 名:
学 生 学 号:
指 导 教 师:
2012年 01
教务处制
PAGE 1
Construction of key problems of project progress control
Abstract
Construction progress was one of the three objectives of the project which is an important component of project management. Reasonable, scientific, efficiency of project construction schedule is the key to achieve the project objectives control. Only during the preparation stage, stage of progress of the programmer design stage, plans and implementation of construction and other links, taking full account of the favorable factors, rational coordination of limited resources, can eventually achieve the progress required by the target, to create advanced, civilization and construction process and lay a solid material foundation.
Keywords: Construction projects; Progress control; Key issues
Progress, investment, quality is the three objectives of the project; there is a relationship of mutual dependence and mutual restriction between them. Project schedule control is an important component of project management and is to ensure that project objectives control is complete the prerequisite for the realization of, to ensure the project duration, the rational use of resources, and lower costs, to prevent plan changes too big and important guarantee for improving the efficiency of project. Management should focus on the following aspects:
1. Attaches great importance to project construction preparation
Project preparation is an important component of construction production, and it is intended to project goals, resource supply and selection of construction plan, spatial layout and the various aspects of time and manpower arrangement. It also is the fundamental guarantee for the smooth conduct of civil engineering construction and equipment installation. Therefore, preparing carefully for technical before construction, materials, labor
您可能关注的文档
最近下载
- 高一数学(必修二)立体几何初步单元测试卷及答案.docx VIP
- “二次元经济”崛起背后的商业逻辑.docx VIP
- 【阶段测试】人教版数学六年级上册第一单元《分数乘法》单元测试卷27.doc VIP
- 中国谷子经济分析:从哪吒旋风看二次元IP衍生品市场崛起.pdf VIP
- 2025年全国高考山东省物理真题试卷(含答案).pdf
- 2025年人教版数学六年级上册单元测试卷-第一单元 分数乘法(含答案).pdf VIP
- 《不负'食'光拒绝浪费》班会课件.pptx VIP
- 部编本《一块奶酪》优质课公开课教案课堂教学实录.docx VIP
- DB13T 5448.3-2021 工业取水定额 第3部分:医药行业.docx VIP
- 山东省安装工程消耗量定额(2016).pdf
文档评论(0)