generation-电站评估中英文文档
11.8.1 Generation (Generación)
11.8.1 发电站(Generación)
11.8.1.1 Structure of the Section
The Consultant reviewed thoroughly the main files comprising the “Generation” Section no. 2 of the FS prepared by CESEL Ingenieros mainly in November 2009 for Xxxxxx
11.8.1.1 部分的结构
顾问仔细核查了构成电站第二部分的主要文件,该关于FS文件主要由CESEL工程组在2009年11月为xxx准备的。
It shall be noted that the Market Study (Estudio Mercado) is included within the engineering section. Usually, this study forms part of a precedent section, where the basic project parameters, conditions and information is assessed and evaluated to distillate t