- 135
- 0
- 约37.57万字
- 约 33页
- 2019-04-27 发布于贵州
- 举报
0783350 05077Lb L65
American Water Works Association
6666 W. Quincy Ave., Denver, CO 80235 (303) 794-771 1
Erratum to
ANSI/AWA C3014 9
Standard
for
Prestressed Concrete Pressure Pipe,
Steel-Cylinder Type
Correction totext:
P.15, Sec. Accelerated curing. Sentence should read,At no time during accelerated
curing shall the temperature within the enclosure be increased at a rate exceeding 40°F
(22°C) perhour.
P.18, Sec. Accelerated curing. Thesecondsentenceshouldread, he coatedpipe
shall be cured under delay, temperature, and humidity conditions required in Sec.
for a minimumperiod of 12 h.
本资料由微信公众号jianzhu118整理
--``,``-`-`,,`,,`,`,,`
持续更新中
Copyright American Water Works Association
Provided by IHS under license with AWWA
No reproduction or networking permitted without license from IHS Not for Resale
STD-AWWA C301-ENGL 1779 0783350 050b173
您可能关注的文档
- BS 7542-1992 混凝土养护剂的试验方法.pdf
- BS EN 717-3-1996木质板材.甲醛释放量的测定.长颈瓶法测定甲醛释放量.pdf
- BS EN 1403-1998金属腐蚀防护电镀涂层 特定一般要求的方法.pdf
- BS EN 1542-1999 混凝土结构的保护和修整用产品和系统.试验方法.由拉脱方法测量粘结强度.pdf
- BS EN 12188-1999 混凝土结构的防护和修整用的产品和系统.试验方法.结构胶粘剂表征用钢与钢胶粘作用的测定.pdf
- CECS 19-1990混凝土排水管道工程闭气检验标准.pdf
- CECS 33-1991 并联电容器装置的电压、容量系列选择标准.pdf
- CECS 194-2006 聚苯模板混凝土结构技术规程.pdf
- CECS35:91锤击贯入试桩法规程 CECS35:91.pdf
- CECS91-97-合流制系统污水截流井设计规程.pdf
原创力文档

文档评论(0)