China: Shangrao
Updated Procurement Plan
The procurement plan will cover the whole period of the project implementation. The Project Implementation Agency shall update the procurement plan throughout the duration of the project at least annually by including contracts previously awarded. All procurement plans, their updates or modifications shall be subject to Bank’s prior review and no objection before implementation.
I. General
1. Project information: Country: China
Borrower: The People’s Republic of China
Project Name: Shangrao
Loan No:
Project ID: P123729
Project Implementation Agency (PIA): Shangrao Sanqingshan Airport Company (SSAC)
The specific works in and outside the airport are as follows:
1
Shangrao Sanqingshan Airport
airfield (4c):runway(2400m*48m), taxiway(a connecting taxiway), apron(290*130)
2
Associated structures (civil work): air traffic control building (600㎡), tower construction (200 ㎡), VOR/DME station (285㎡) , Instrument Landing System/DME station (60㎡) , weather observation station (100㎡), office building (1150㎡) , staff accommodation buildings(1080㎡), central transformer substation(500㎡), air conditioning building(300㎡), cargo warehouse(400㎡), fire protection and rescue building(2200㎡), water supply station(350㎡), reservoir(300㎡)fire fighting reservoir (500㎡), wastewater treatment and solid waste transfer station(350㎡), parking lot(5200㎡)
3
General airport facility not occupied by building (roads, parking, fencing, landscaping)
4
Heating, water supply, power supply
5
Storm water ,waste water treatment
6
Works of storm water reuse system and ground aircraft auxiliary power unit for further strengthening environmental and energy-saving measures
2. Bank’s approval Date of the procurement Plan: Originally approved on November 22, 2012; updated on February 1, 2013
3. Date of General Procurement Notice: February 1, 2013
4. Period covered by this procurement plan: 2
您可能关注的文档
最近下载
- 第15章量子物理-效应.pptx VIP
- 精品解析:浙江省杭州市余杭区2024-2025学年八年级10月月考语文试题(原卷版).docx VIP
- 镧热还原法年产35吨稀土金属钐的工艺设计.docx VIP
- 镧热还原法年产25吨稀土金属钐的工艺设计.docx VIP
- 2024年江西省南昌市保安员上岗资格证考试题库及答案(真题) .pdf VIP
- 2025年北师大版一年级数学上册月考试卷含答案.doc VIP
- 劳动教案(全册)五年级上册——人民出版社(表格式).pdf VIP
- 2025年部编版七年级 语文(上下全册)字词拼音及解释 .pdf VIP
- 安全标识中英文可直接打印.doc VIP
- 退役士兵驾驶技能培训服务投标方案(技术标).pdf VIP
文档评论(0)