(12天津) The letters for the boss______ on his desk but he didnt read them until three days later. A. were put B. was put C. put D. has put (12四川) They are living with their parents for the moment because their own house______. A. is being rebuilt B. has been rebuilt C. is rebuilt D. has rebuilt (12湖南) Dont worry. The hard work that you do now_______ later in life. A. will be repaid B. was being repaid C. has been repaid D. was repaid (12 陕西) --Can I call you back at two oclock this afternoon? --Im
您可能关注的文档
- 北师大版必修三22分层抽样与系统抽样.ppt
- 被减数和减数与差.ppt
- 被酒独行,遍至子云、威、徽、先觉四黎之舍三首①其二苏轼.ppt
- 必修4辅助角公式.ppt
- 必修4课件242平面向量数量积的坐标表示、模、夹角.ppt
- 必修5优秀课件25等比数列的前n项和第一课时.ppt
- 必修二unit5Freddythefrog复习课件.ppt
- 必修二第五单元单词.pptx
- 必修二情景式名句默写.ppt
- 必修三unit3宾语从句和表语从句.ppt
- 中国国家标准 GB/T 48358-2026电子组件用元器件和零件的晶须试验方法.pdf
- GB/T 48358-2026电子组件用元器件和零件的晶须试验方法.pdf
- 中国国家标准 GB/T 15298.1-2026电子设备用电位器 第1部分:总规范.pdf
- GB/T 15298.1-2026电子设备用电位器 第1部分:总规范.pdf
- 《GB/T 15298.1-2026电子设备用电位器 第1部分:总规范》.pdf
- GB/T 7962.1-2026无色光学玻璃测试方法 第1部分:折射率和色散系数.pdf
- 中国国家标准 GB/T 7962.1-2026无色光学玻璃测试方法 第1部分:折射率和色散系数.pdf
- 《GB/T 7962.1-2026无色光学玻璃测试方法 第1部分:折射率和色散系数》.pdf
- 《GB/T 7095.1-2026漆包铜扁绕组线 第1部分:一般规定》.pdf
- 中国国家标准 GB/T 7095.1-2026漆包铜扁绕组线 第1部分:一般规定.pdf
原创力文档

文档评论(0)