- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
辽宁工业大学本科生论文翻译题目名称 Bridge Construction Techniques 桥梁施工方法 学院:土木建筑工程学院 专业: 道桥专业: 学生: 指导教师: 完成日期:2012.4指导教师意见:成绩: 评定教师: 2012 年04 月7 日 Bridge Construction Techniques The final cost of a bridge is the sum of the cost of permanent materialsthe proportionatecost to the project of plant and temporary works and the cost of labor .The cost of permanentmaterials can be estimated reasonably correctly.With experiencea bridge contractor can dealcompletely with cost of plant and temporary works .But the labor cost does not lend itself toexact analysis .Recent competitive designs have attempted to introduce innovations inconstruction methods with a view to effect economy in the cost on labor by reducing temporaryworks and by minimizing the duration of site work. The suitable techniques of construction of bridge superstructure will vary from site tositeand will depend on the spans and length of the bridge type of the bridgematerials used andsite conditions. For instance cast-in-site concrete construction could be adopted for short spansup to 40 m if the river bed is dry for a considerate portion of the year whereas free cantileverconstruction with prestressed concrete decking would be appropriate for long spans in rivers withnavigational requirements. The current trend is towards the avoidance of staging as much aspossible and to use precast or prefabricated components to maximum extent.Also constructionmachinery such as cranes and launching girders are coming into wider use . These are greatersavings to be effected by paying attention to the method of construction even from the designstage than by attacking permanent materials . Short Span Bridges For bridges involving spans up to 40 m the superstructure may be built on stagingsupported on the ground . Alternatively the girders may be precast for the full span length anderected using launching girders or cranesif the bridge has many equal spans.In the latterprocedure the additional cost on erection equipment should be less than
您可能关注的文档
最近下载
- 基础化学高职高专第五版高琳第六章第一节化学平衡与平衡常数.pptx VIP
- 输电线路全寿命周期设计建设技术导则.pdf VIP
- 基础化学高职高专第五版高琳第十章氧化还原平衡.pptx VIP
- 人教B版高中数学必修二同步讲义:平面向量线性运算的应用(学生版+解析).pdf VIP
- 人教B版高中数学必修二讲义:向量的坐标及其运算(学生版+解析).pdf VIP
- 人教B版高中数学必修二同步讲义:向量的基本定理(学生版+解析).pdf VIP
- 基础化学高职高专第五版高琳第十一章脂肪烃.pptx VIP
- 浅谈搅拌站与精细化管理 - 管理文章.docx VIP
- 混凝土精细化管理.docx VIP
- 一种调料售货机的自动售货方法.pdf VIP
文档评论(0)