T公司新厂区建设项目进度控制研究.pdf

  1. 1、本文档共50页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Study on schedule control of T company new factory construction project Abstract: Since China's reform and opening up, urban construction, earth-shaking changes. Project management is gradually strengthened, but the management there is great international distance. Project management includes seven aspects: schedule control, cost (investment) control, quality control, contract management, security management, information management, and organization coordination. This article only describes the progress control of the management. This article discusses how to do the project schedule control, network planning technology and its application in the progress control. Network planning methods generated by the control project progress, schedule control is the primary method has been successfully carried out numerous large and complex project progress control, and have achieved good results. Network planning, said the work is by means of the network and the time required, and the relationship between the work of a technology. Through network analysis, project cost and duration of the relationship between, find out in the preparation of plans and planning process in the implementation of the key routes . With the computerization of the entire process of network planning application the popularity of network planning in project management, schedule control will play an increasingly important role. Now, in the construction industry where the owner of the project bidding, supervision of the progress of party c

您可能关注的文档

文档评论(0)

lh2468lh + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档