上海交通大学硕士研究生论文 ABSTRACT and 5W1H methods to reduce waiting time of WIP and eliminate unnecessary transportation, as well as lots of non-value-added operations. In addition, the clutch assembly line is balanced to eliminate the phenomena of unbalanced cycle time in different steps. Morever, the layout is optimized with the package area attached to get less package quality complain from customer. After the optimization, the future Value Stream is mapped. After the optimization of cover assembly line, the lead time of cover reduced from 45s to 30s which enlarges the cluth cover production capacity