复杂地质条件下高寒隧道快速施工技术
: Mila Mountain Tunnel is the worlds highest highway tunnel, with a length of 5.727 km, an average elevation of 4750 meters, has the characteristics of subnival area, low temperature, low pressure, hypoxia, and geological fragmentation. Through heat preservation and heating of mixing station and raw materials, effective heat preservation of high pressure water, optimization of surrounding rock construction of water-rich fault broken zone, optimization of tunnel construction machinery combination and staffing, and strengthening ventilation and oxygen supply research, practi