高速列车荷载下无砟轨道裂纹内水流特性研究.PDFVIP

高速列车荷载下无砟轨道裂纹内水流特性研究.PDF

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高速列车荷载下无砟轨道裂纹内水流特性研究.PDF

Hans Journal of Civil Engineering 土木工程, 2013, 2, 156-161 /10.12677/hjce.2013.22027 Published Online May 2013 (/journal/hjce.html) Study on Characteristic of Flow for Non-Ballasted Track * Crack under the High Speed Railway Action Guihong Xu, Xueyi Liu, Rongshan Yang, Yong Peng MOE Key Laboratory of High-Speed Railway Engineering, Southwest Jiaotong University, Chengdu Email: smileanne@163.com Received: Dec. 18th st rd , 2012; revised: Jan. 21 , 2013; accepted: Feb. 3 , 2013 Copyright © 2013 Guihong Xu et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unre- stricted use, distribution, and reproduction in any medium, provided the original work is properly cited. Abstract: The non-ballasted track had been widely used with the massive construction of the high-speed railway in China. The damage issue of non-ballasted track mainly based on the flaw was becoming gradually evident, especially the influence of rainwater to the damages. Nowadays there was a lack of the systematic research on the relevant prob- lems at home and abroad. This paper focuses on the flow characteristics of CRTSII non-ballasted track interlayer crack. Unified governing equation and mathematical model were established in solid and fluid domain, based on the two-way coupled field computation, at the high speed train loads action. The water flow characteristics had been simulated in CRTSII non-ballasted track Interlayer crack. Analysis shows that: 1) At the high-speed train loads action, crack surface pressure of every monitor is linear increased with the crack length, the more close the crack tip, the more pressure; 2)

文档评论(0)

zhongshanmen002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档