* This cooling system (HV water pump with motor) always activates when the power mode is selected to READY-ON state. Radiator for inverter is located above A/C condenser 当处于READY-ON模式时,冷却系统(HV水泵)总处于激活状态。 变频器散热器位于A/C压缩机上面。 * * Measure the volume of the drained coolant, and replace it with a volume that is greater than the drained coolant (as a guide for bleeding air). 测量排放的冷却液量,用多于排放量的冷却液加注() * Active Test: Powertrain “Hybrid Control “Active Test “Active the Water Pump“ Point: Air bleeding is completed if the operating sound of the water pump decreases and the flow of the coolant in the res
您可能关注的文档
最近下载
- 顺丰丰翼科技:物流无人机的规模化运营与盈利模式.docx VIP
- 上海交通大学《建筑施工工艺与安全》2023-2024学年第一学期期末试卷.doc VIP
- 娱乐场所应急措施及预案.docx VIP
- 上海交通大学《材料力学》2023-2024学年第一学期期末试卷.doc VIP
- 2026年海战史测试题及答案.docx VIP
- 环球影城策划方案.docx VIP
- 蒋志刚等-保护生物学26第20章 香港的生物多样性及其保护.pdf VIP
- SL∕T 813-2021 规划水资源论证技术导则.pdf
- 2017年江苏级机关公开遴选公务员报名推荐审核表.doc VIP
- 环球影城策划方案_20250204_192550.docx VIP
原创力文档

文档评论(0)