- 6
- 0
- 约2.95千字
- 约 35页
- 2019-07-31 发布于河南
- 举报
Unit 6
An old man tried to ;Warming up;What’s the name of the story?;Ne Zha Conquers the Dragon King;Chang’e Flies to the Moon;Match;Listen and check (√) the facts you hear. Which story are Anna and Wang Ming talking about?;____ The two mountains were very high and big.
____ A very old man tried to move the mountains.
____ A man told Yu Gong that he could never do it. ;1. How does the story begin? ;2. What happened next?;Listen and number the pictures [1-4] in order to tell the story. ;1. A man saw Yu Gong and his (children / family) when they were working on moving the mountains.
2.
您可能关注的文档
- 英语人教版七年级下册unit7it's raining A(1a_2c).doc
- 英语人教版七年级下册导学单.doc
- 英语人教版七年级下册导学单.docx
- 英语人教版七年级下册导学练.doc
- 英语人教版七年级下册导学设计.docx
- 英语人教版七年级下册第1课时 Section A (1a~1c).doc
- 英语人教版七年级下册Unit7It's raining (1A-1C).ppt
- 英语人教版七年级下册第1课时section A 1a—1c .doc
- 英语人教版七年级上册写作题目.docx
- 英语人教版七年级下册第2课时Section A 2d--3c.ppt
- GB/T 18310.12-2026纤维光学互连器件和无源器件 基本试验和测量程序 第2-12部分:试验 撞击.pdf
- 《GB/T 18310.12-2026纤维光学互连器件和无源器件 基本试验和测量程序 第2-12部分:试验 撞击》.pdf
- 中国国家标准 GB/T 18310.12-2026纤维光学互连器件和无源器件 基本试验和测量程序 第2-12部分:试验 撞击.pdf
- GB/T 48299.1-2026核电厂安全重要仪表和控制系统 HDL可编程集成电路开发 第1部分:执行A类功能的HDL可编程集成电路.pdf
- 中国国家标准 GB/T 48299.1-2026核电厂安全重要仪表和控制系统 HDL可编程集成电路开发 第1部分:执行A类功能的HDL可编程集成电路.pdf
- 《GB/T 48299.1-2026核电厂安全重要仪表和控制系统 HDL可编程集成电路开发 第1部分:执行A类功能的HDL可编程集成电路》.pdf
- 中国国家标准 GB/T 36463.1-2026信息技术服务 咨询设计 第1部分:通用要求.pdf
- GB/T 36463.1-2026信息技术服务 咨询设计 第1部分:通用要求.pdf
- 中国国家标准 GB/T 48564-2026压力容器全寿命周期风险控制规范.pdf
- GB/T 48564-2026压力容器全寿命周期风险控制规范.pdf
最近下载
- 2026年度党建工作总结与2027年工作计划.docx VIP
- 2025年环境影响评价师个人风险与社会风险计算与评价专题试卷及解析.pdf VIP
- 蜀汉英雄传全攻略.pptx VIP
- 新能源汽车高压安全与防护.pptx VIP
- 2025年金融风险管理师基于宏观经济变量的信用转移矩阵模型专题试卷及解析.pdf VIP
- 管理学-北京师范大学-中国大学MOOC慕课答案.pdf VIP
- 鲁迅文化基金会换届财务审计报告.pdf VIP
- 2020新译林版高二英语选择性必修三unit1课文及翻译(英汉对照).doc VIP
- sgs员工级别制度.docx VIP
- 2023新译林版新教材高一英语必修全三册课文翻译(必修一~必修三).pdf VIP
原创力文档

文档评论(0)