- 18
- 0
- 约1.53万字
- 约 14页
- 2019-08-11 发布于安徽
- 举报
PAGE 0
PAGE 1
.
.
Uninterruptable Power Supply
UPS-(5-200)KVA
Users Manual
使用手册
1.Brief introduction:
UPS-(5-200KV) 3 phase in and 3phase out series UPS is large power and true on–line UPS with range from 5KVA to 200KVA, which adopts advanced digital design, high speed 16–bit chip, ASIC, DDC and large power IGBTSCR, and shows large capacity, high stability and super performance compared with usual models on the market. All the products have integrated the latest hardware and powerful software in itself, which could provide optimum pure power to integrated server center. This system supports several units connected in parallel through unique control technology.
2.Operation demand:
Please read carefully the user manual before using machine.
This manual must be understood and conserved by professional.。
This manual does not introduce the detail specification.
This manual just suit to UPS-(5-200KV) 3 phase in and 3phase out series UPS.
3.Notices :
3.1 Make sure relevant power input/output/battery/cable.
3.2.It must be steady grounding system.
3.3. There are a lot of high-voltage energy storage device in Machine, please dont open case and check, otherwise cause danger to lift, accept the consequences by oneself. The operator must understand the electrician basic knowledge and pore over the operation instructions.
3.4. Without permission, cant dismantle various kinds of connection cables without authorization.
3.5. Because this product is greater in volume, weight is relatively heavy, cant move at will, must not split and shake strongly Move, and keep ventilating it well.
3.6. In case of electrification, cant go to discharge the dust; Handy wet towel go to wipe and get rid of the dirt.
3.7. The battery must be changed by the professional and technical personnel, the battery changed out must deliver special circulation and give a new lease of life to the organization to deal with . The battery is poisonous waste material
3.8. UPS is not used when being installe
您可能关注的文档
- 空气动力学基础.doc
- 现代信号处理复习题.doc
- 导函数大题类型总结.doc
- 悬挑外脚手架施工方案交底.doc
- 中国上古神兽妖怪图鉴.doc
- 历史思维导图浓缩初中全部知识点,初一到初三考高分必备.doc
- W5300控制器详细设计及使用说明文档.doc
- 220kV线路保护标准化作业指导书.doc
- GE双电源使用说明书.doc
- 热泵冷暖机组安装规程.doc
- 2025年吉安职业技术学院单招《数学》考前冲刺试卷附参考答案详解【培优】.docx
- 2026年黔东南民族职业技术学院单招职业适应性测试题库及参考答案详解一套.docx
- 2025年合肥滨湖职业技术学院单招《数学》考前冲刺练习附答案详解(综合题).docx
- “善写妙人者不于有处写”——“虚写”在诸葛亮出场前的运用.docx
- 2025年合肥滨湖职业技术学院单招《数学》考前冲刺测试卷及答案详解(全国通用).docx
- 2025年合肥职业技术学院单招《数学》练习题(模拟题)附答案详解.docx
- 2025年合肥共达职业技术学院单招《数学》考前冲刺试卷【巩固】附答案详解.docx
- 2026年黔东南民族职业技术学院单招职业技能考试题库带答案详解.docx
- 2025年合肥信息技术职业学院单招《数学》综合提升测试卷附答案详解【B卷】.docx
- 防凌应急分洪区续建工程项目可行性研究报告.docx
原创力文档

文档评论(0)