zj70d钻机第三台泥浆泵技术改造方案.docVIP

  • 4
  • 0
  • 约4.48千字
  • 约 6页
  • 2019-08-31 发布于上海
  • 举报
Technical reform third mud pump of model ZJ70D rig * TAN Gang-qiang YU Ming-jian LOU Chun-quan DENG Zu-zhong (Drilling and exploring company, Sichuan Petroleum Administration, chongqing 400021,china ) Abstract: When contract with drilling at abroad, the rig of electric -drive ZJ70D must had third mud pump, but many 7000m electric -drive rigs which introduced or made by our country had not third mud pump and sustain, the trouble of reform is mechanism and electric sect. effective borrow and refit top drive sustain by analyzed in theory and practice, content for the first side in technical spec

文档评论(0)

1亿VIP精品文档

相关文档