logo

您所在位置网站首页 > 海量文档  > 专业论文 > 工科论文

安全英文文献2.pdf 15页

本文档一共被下载: ,您可全文免费在线阅读后下载本文档。

  • 支付并下载
  • 收藏该文档
  • 百度一下本文档
  • 修改文档简介
全屏预览

下载提示

1.本站不保证该用户上传的文档完整性,不预览、不比对内容而直接下载产生的反悔问题本站不予受理。
2.该文档所得收入(下载+内容+预览三)归上传者、原创者。
3.登录后可充值,立即自动返金币,充值渠道很便利
特别说明: 下载前务必先预览,自己验证一下是不是你要下载的文档。
  • 上传作者 对影(上传创作收益人)
  • 发布时间:2019-09-11
  • 需要金币200(10金币=人民币1元)
  • 浏览人气
  • 下载次数
  • 收藏次数
  • 文件大小:2.64 MB
下载过该文档的会员
你可能关注的文档:
Journal of Cleaner Production xxx (2016) 1 e15 Contents lists available at ScienceDirect Journal of Cleaner Production journal homepage: /locate/jclepro Schedule risk modeling in prefabrication housing production Clyde Zhengdao Li a, Geoffrey Qiping Shen a, *, Xiaoxiao Xu b, **, Fan Xue a, Lucila Sommer c, Lizi Luo a a Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong b College of Civil Engineering, Shenzhen University, Nanshan, Shenzhen, China c Department of Construction and Management, Federal University of Rio Grande do Sul, Brazil a r t i c l e i n f o a b s t r a c t Article history: Every country is dealing with its own housing problems; however, none compares with Hong Kong Received 11 April 2016 where housing has always been a major concern as a result of low supply over the past decades. Against Received in revised form the constraints in delivering sufficient houses, prefabrication as a sustainable solution for housing has 4 November 2016 been increasingly advocated for its potential merits of better quality, construction safety and cleaner built Accepted 5 November 2016 Available online xxx environment. However, schedule delay caused by various risks affected the prefabrication housing production (PHP) in Hong Kong. This problem can be further worsened when the manufacturing sector o

发表评论

请自觉遵守互联网相关的政策法规,严禁发布色情、暴力、反动的言论。
用户名: 验证码: 点击我更换图片

“原创力文档”前称为“文档投稿赚钱网”,本站为“文档C2C交易模式”,即用户上传的文档直接卖给(下载)用户,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有【成交的100%(原创)】。原创力文档是网络服务平台方,若您的权利被侵害,侵权客服QQ:3005833200 电话:19940600175 欢迎举报,上传者QQ群:784321556