- 10
- 0
- 约5.11万字
- 约 10页
- 2019-10-15 发布于湖北
- 举报
目录
1. Reference 2
2. Brief on the system process系统流程介绍 2
3. Process flow chart流程图 3
4. Preparation before auxiliary equipment start-up辅机启动准备工作 3
5. Temperature and pressure rising of the PH boiler窑尾锅炉升温升压 3
6. Main steam pipes heating主蒸汽管加热 3
7. Warming-up process准备启动过程 3
8. Parallel in并网 3
9. Inspection and maintenance while the turbine running汽轮机运行时的检查维护 3
10. Inspection and maintenance while the generator running发电机运行时的检查维护 3
11. AQC Boilers start窑头锅炉启动 3
12. Normal shut-down procedure of turbine and generator汽轮发电机正常停机程序 3
13. Maintenance during steam turbine shut-down汽轮机停机时的检查维护 3
14. Insp
原创力文档

文档评论(0)