- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Designing an Underground Structure with STAAD
Dr. Mukti L. Das
Principal Engineer
Bechtel Power Corporation
Frederick, MD
1. Introduction
The purpose of this paper is to share the author’s experience of STAAD that was used to
solve an important underground structure in the Boston Central Artery, popularly known
as Big Dig Project. As an independent consultant, the author was involved in
investigating the design adequacy of a section of the underground transit system as
shown in Figure 1.
2. Development of STAAD Model
Starting from the top, there is a varying depth of soil cover followed by the top concrete
slab of the tunnel. There are two viaduct columns directly supported on the concrete slab.
The second column is on the left of the one that is shown on the upper left corner of
Figure 1 and is not shown. This sketch also shows 10’ wide segmented T-shape slurry
wall with 10’ wide flange facing outside at regular interval. The bottoms of these
concrete walls extend into the bed rock. At the top, these segmented slurry wall strips
support T-shape slurry walls with wider flange facing outside and budding to each other
along the length of the tunnel forming its wall. These wider T-shape walls with web
protruding inside the tunnel resist the earth pressure. There are concrete beams
connecting two tunnel walls. These connecting beams are shown as small rectangles just
under the bottom slab of the tunnel. The train rails are supported on this bottom slab.
Figure 1: Longitudinal view of a section of the tunnel
A finite element model of the tunnel section left of and including the viaduct column
shown in Figure 1 was developed with STAAD. The T-shape slurry walls were modeled
as BEAM members as they were not a monolithic wall. The top and bottom slabs were
modeled as finite element mesh
您可能关注的文档
- 国际工程资料series_0000.pdf
- 国际工程资料Simpson_Anchors_2008-03_by_Jason_Oakley.pdf
- 国际工程资料SNiP 2-01-07-85__ Loads-And-Impacts.pdf
- 国际工程资料SNIP II-7-81_seismic.PDF
- 国际工程资料STAAD Pro 钢圆板算例.pdf
- 国际工程资料Structural Steel Shapes Dimensions.pdf
- 国际工程资料torsional rigidity of ribs in the buckling of reinforced panels-analytical study.pdf
- 国际工程资料Track Components Section.pdf
- 国际工程资料TutorialRC-RE.pdf
- 国际工程资料TutorialRC-RSS.pdf
- 2025年广东省深圳市警务辅助人员招聘考试(公安素质测试)仿真试题及答案.docx
- 2025年海南省三沙市员额法官遴选面试考题及答案.docx
- 2025年广东省专业技术公需课人工智能赋能制造业高质量发展试题及答案.docx
- 2025年海南省三沙市政府采购评审专家测试题库及参考答案.docx
- 2025年广西柳州市法官逐级遴选考试题及答案.docx
- 2025年规范办学行为自查报告1.docx
- 2025年海南省三沙市政府采购评审专家考试测试题及答案.docx
- 2025年海南省三沙市政府采购评审专家考试试题库(附答案).docx
- 2025年规范招生工作自查报告.docx
- 2025年海南省三沙市政府采购评审专家考试真题(附含答案).docx
原创力文档


文档评论(0)