- 1、本文档共52页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
* * * * * * * * * The figure above is a simplified version of the Purdue model, showing the S95 scope. Level 4 is high level planning and scheduling and logistics. Level 3 is manufacturing control, including operations scheduling - or planning. Level 2 needs a lot of definition. Describe S88.01 and the batch model and how it stops at the process cell. Describe some of the S88.01 models. There are less well-defined models for continuous and discrete processes. Continuous is handled somewhat by S88.01, but without the concept of recipes for products, just recipes for product startup and shutdown. PDXI has a model at least of all of the static information (design of PIDs) and control loops, but not very dynamic Discrete models SME (Society of Mechanical Engineers has some material, but nothing in the ISA /IEC/ISO arena. * * * * Briefly list/discuss topics to be covered in this section. Duration: Spend approximately 1.5 hours on this section. * * * * * * * * * * * * One production schedule may encompass more than the scope of one control system. In this example the production schedule is broken into separate schedules for different types of packages. * * * * * * * The WBF Schemas based upon ISA-95 * * * * * * OAGi General Meeting ISA-95 - B2MML Briefing * May 2, 2006 Production Schedule Model Personnel Requirement Equipment Requirement Material Produced Requirement Personnel Model Equipment Model Material Model Corresponds to element in Corresponds to element in Corresponds to element in May contain 0..n 0..n 0..n 0..n 1..n Personnel Requirement Property Equipment Requirement Property Material Produced Requirement Property 1..n 1..n 1..n Production Schedule Process Parameter Material Consumed Requirement Corresponds to element in 0..n Material Consumed Requirement Property 1..n Consumable Expected 0..n Consumable Expected Property 1..n Segment Requirement 1..n Is made up of Is made up of Is associated to either Product Production Rule Requested Segment Response
文档评论(0)