深水半潜平台技术.docVIP

  • 2
  • 0
  • 约1千字
  • 约 25页
  • 2019-12-23 发布于湖北
  • 举报
深水半潜式钻井平台技术讲座 刘云刚 CNPC 200710 1 讲座内容 –半潜钻井平台的主要组成; –半潜钻井平台的结构型式演变; –半潜钻井平台的发展趋势; –半潜钻井平台的总体布置示例; –半潜钻井平台的建造和安装; –半潜平台的锚泊系统计算分析; –半潜平台的最小气隙计算 –半潜平台的稳定性校核; CNPC 200710 2 Well system Drilling Riser GVA 4500 Drilling Unit (2, built at DSME, 4th generation GVA 7500 Drilling Unit (6, to be built at DSME, 6th generation About160 MODU with many bracings Semi-submersible Construction ---On-land Practice Ulsan, Korea Transport on Dockwise’s Mighty Servant 3 (14,500 tonnes Pontoon block Pontoon ring erection Column blocks → Erection of column → Mating of 17,500 tonnes Semi-submersible Construction ---Dry-dock Practice Hull Fabrication in Dry-dock Construction methods depend on shipyard conditions ?Marsk Constractor –Blocks fabricated (pontoons, columns etc. –Transported to Caspian Sea –Assembled on-site ?Small dry-dock –Two Pontoons fabricated separately –Connected outside dry-dock ?Two nearby small dry-dock –One pontoon in each dry dock –Temporary bracings –Bracing welded outside dry-dock

文档评论(0)

1亿VIP精品文档

相关文档