- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Problem A: Managing The Zambezi River
The Kariba Dam on the Zambezi River is one of the larger dams in Africa. Its
construction was controversial, and a 2015 report by the Institute of Risk Management of South Africa included a warning that the dam is in dire need of maintenance. A number of options are available to the Zambezi River Authority (ZRA) that might address the situation. Three options in particular are of interest to ZRA:
(Option 1) Repairing the existing Kariba Dam
(Option 2) Rebuilding the existing Kariba Dam, or
(Option 3) Removing the Kariba Dam and replacing it with a series of ten to twenty smaller dams along the Zambezi River.
There are two main requirements for this problem:
Requirement 1 ZRA management requires a brief assessment of the three
options listed, with sufficient detail to provide an overview of potential costs and
benefits associated with each option. This requirement should not exceed two
pages in length, and must be provided in addition to your main report.
Requirement 2 Provide a detailed analysis of Option (3) - removing the Kariba
Dam and replacing it with a series of ten to twenty smaller dams along the
Zambezi river. This new system of dams should have the same overall water
management capabilities as the existing Kariba Dam while providing the same or
greater levels of protection and water management options for Lake Kariba that
are in place with the existing dam. Your analysis must support a recommendation
as to the number and placement of the new dams along the Zambezi River.
In your report for Requirement 2, you should include a strategy for modulating the water flow through your new multiple dam system that provides a reasonable balance
between safety and costs. In addition to addressing known or predicted normal water
cycles, your strategy should provide guidance to the ZRA managers that explains and
justifies the actions that should be taken to properly handle emergency water flow
situations (i.e. flooding and/or prolon
您可能关注的文档
- 2014年中考试题分类汇编(反比例函数).doc
- 2014届高三文科数学一轮复习之2013届名校解析试题精选分类汇编9:圆锥曲线.doc
- 2014年维修会议纪要.doc
- 2014年经济学知识:已知国民消费函数CY进口函数MY如果出口理论考试试题及答案.doc
- 2014广州版四上双基短语.doc
- 2014春季老带新手拉手方案.doc
- 2015-2016学年第一学期科技兴趣小组活动总结.doc
- 2015.6.15防汛专题会议纪要.doc
- 2015届高三年级理解性默写练习.doc
- 2015年6月英语六级作文题目及范文汇总.doc
- 2026年毛概期末考试试题库含答案(轻巧夺冠).docx
- 2025年兴业银行哈尔滨分行雏雁计划暑期实习生招聘(公共基础知识)综合能力测试题附答案.docx
- 2025陕西延安市甘泉县事业单位定向招聘大学生退役士兵1人(公共基础知识)测试题附答案.docx
- 2025江西赣州市章贡区招聘区教育体育局下属事业单位体育类特殊专业技术人才2人(公共基础知识)综合能.docx
- 2025年河北保定市第一中学选聘教师14名(公共基础知识)综合能力测试题附答案.docx
- 2024年荆州市直遴选考试真题汇编及答案解析(夺冠).docx
- 2025贵州余庆县农业农村局招募特聘农技人员(公共基础知识)综合能力测试题附答案.docx
- 2026年成都银行秋季校园招聘(120人)(公共基础知识)测试题附答案.docx
- 2024年叶城县幼儿园教师招教考试备考题库推荐.docx
- 2024年西华县幼儿园教师招教考试备考题库附答案.docx
原创力文档


文档评论(0)