Rokeby发电站通过使用Liqui-Cel® 14x28 膜组件去除CO2,扩展混合床式树脂的寿命,节省资本费用50%.pdf

Rokeby发电站通过使用Liqui-Cel® 14x28 膜组件去除CO2,扩展混合床式树脂的寿命,节省资本费用50%.pdf

  1. 1、本文档共2页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Rokeby Generating Station Saves 50% in Capital Expense by Using Liqui-Cel® 14x28 Membrane Contactors to Remove CO2 to Extend Mixed Bed Resin Life Lincoln Electric Systems (LES) recently commissioned a membrane decarbonation system using Liqui-Cel® 14x28 Membrane Contactors to remove CO2 prior to their mixed bed deionizers. The system was installed at the Rokeby Generating Station (RGS) in Lincoln, Nebraska. Background The Rokeby Generating Station is LES’ primary peaking power station, totaling 255 MW and consisting of 3 duel fuel combustion turbines. The existing DI water system consisted of two single-pass, two-stage RO skids followed by a 31 ft3 3 (0.87 m ) mixed bed deionizer and two 250,000-gallon (943 m3) storage tanks. LES determined that the mixed bed unit was producing only 30% of its expected capacity (90,000 gallons actual vs. 300,000 gallons expected or 341 m3 actual vs. 1136 m3 expected). It was determined that the cause of the decreased capacity was due to dissolved CO2 in the water, which was overloading the anion resin. As the power capacity demand increased, LES had to act quickly to update their winter contingency plans. System Design In 2005, LES began engineering a membrane Treatment Options decarbonation system using Liqui-Cel 14x28 Multiple treatment options including chemical Membrane Degasifiers. The system was designed treatment and the installation of a forced draft to treat the combined water flow from both RO degasifier were considered. Ultimately, chemical skids, approximately 150 GPM (0.6 m3). The goal treatment was considered too risky because of was to achieve approximately 90% reduction of its negative impact on increasing scale on the dissolved CO2. Add

文档评论(0)

GG-水处理 + 关注
实名认证
内容提供者

资深水处理工程师,环保工程师

1亿VIP精品文档

相关文档