- 3
- 0
- 约1.76万字
- 约 48页
- 2020-09-08 发布于湖北
- 举报
建筑工程管理塔架施工方案
Erection Program For
the 443-3P1preheater tower
Name of the document:The Erection program of the
443-3P1 preheater tower
No. of the document:GU3-方案-M-010
Editing department:The Engineering department of CBMI
Edited by:Liu Li Da Date:2013-11-20
Verified by: Date:
Approved by: Date:
Version 0
目 录
contents
一.工程概述 Summary------------------------------------3
二.方案编制依据Compilation basis ---------------------3
三.吊装机具的选择The choice of Lifting instrument-----6
四.质量安全保证体系流程图
The flow chart of quality safety guarantee syst
原创力文档

文档评论(0)