道达尔勘探开发 规范 GS_EP_EXP_205_SPF-R 2010.XLS

道达尔勘探开发 规范 GS_EP_EXP_205_SPF-R 2010.XLS

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Feuil1 CROSS REFERENCE LIST form Index3 CROSS REFERENCE LIST SPL-R form index2 SPL-R SPF-R form Index1 SPF-R _Toc207184947 _Toc207184948 _Toc207184949 FournFab OLE_LINK3 SPF Name of the project with the logo SPL-R originator Name of the Manufacturer Adress of the Manufacturer Phone number of the Manufacturer Fax number of the Manufacturer E-mail address of the Manufacturer CONTACT DATE VISA SUBSIDIARY JOB FIELD NAME AMOUNT PHONE FAX ADDRESS Leading discipline: Written by: Type of parts Unit Delivery time (week) Unit price (Currency) Management type Quantity mini for MM Quantity maxi for MM Quantity for SU SE Quantity to order Date: Rev description: APPROVAL Autorisation for expenses REVISION List total amount : email installed Quantity maxi installed on one equipment 11 Revision no: SPL-R no SPL-R Revision no: 20 Tag no Remarks: 14 No. Completion by Instructions COMPANY project name with the logo Legal name of the subsidiary for which material is intended Relevant job number – no. of Maintenance Engineering Contract Name of the field on which the material is to be installed. Code or name of the section on the field COMP. Name, date and signature of the COMPANY person in charge (usually the project maintenance engineer) Revision number Revision date Revision description Leading discipline of the package COMP Approbation by COMPANY MANUFACTURER reference of the spare part Precise description of the material or spare part. Should allow complete identification of the material. (As per COMPANY procurement department requirements) Total quantity of installed spare parts Unit prices of the parts must be indicated ex-works with standard packaging Revision number of the list SPF-R number as per the project document numbering specification. Revision date of the File Revision number of the file Line by line = number of the SPL-R list for the relevant Manufacturer Revision date of the list Reviewed by MIE List of Units Item no. ADRESS Contact Phone MIEC Contactor Repre

文档评论(0)

gushiwen300 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档