- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2018年6月四级考试真题(第三套)
Part I Writing (30 minutes)
Directions: 几r this part, you are allowed 30 minutes to write a short essay on the importanceof speaking ability and how to develop it. You should write at least 120 words butno more than 180 words.
Part II Listening Comprehension
说明: 2018年6月四级真题全国共考了两套听力。 本套的听力内容与第二套的完全一样,只是选项的顺序不一样而巳
Part ID Reading Comprehension (40 minutes)
Section A
Directions:/几 this section, there is a passage with ten blanks. You are required to select one word for each blank from a list of cho即es given in a word bank following the passage. Read the passage through carefully before making your choices. Each choice in the bank is identified by a letter. Please mark the corresponding letter for each item on Answer Sheet 2 with a single line through the centre. You may not use any of the words in the bank more than once.
An office tower on Miller Street in Manchester is completely covered in solar panels. They areused to create some of the energy used by the insurance company inside. When the tower wasfrrst 26 in 1962, it was covered with thin square stones. These small square stones becamea problem for the building and continued to fall off the
face for 40 years until a major renovationwas
27
.
During this renovation the buildings owners,
CIS,
28
the solar panel company, Solarcentury. They
agreed
to cover the entire building in solar panels.
In 2004, the
completed CIStower became Europes largest
29
of vertical solar panels. A vertical solar project on such alarge
30 has never been repeated since.
Covering a skyscraper with solar panels had never been done before, and the CIS tower waschosen as one ofthe 10 best green energy projects . For a long time after this renovation project, it was the tallest building in the United
Kingdom, but it was 31
overtaken by the Millbank Tower.
Green buildings like this arent
32
cost-efficient for
the investor, but it does produce muchless pollution
than that caused by energy
33
through fossil fuels. As solar pa
您可能关注的文档
最近下载
- 国网(电气类)本科考试复习资料电力系统继电保护基础知识.doc VIP
- 西南18J312 楼地面、踢脚、变形缝、涂料构造.docx VIP
- 2025年广东春考语文试卷原卷及答案.doc VIP
- 压制成型技术及其理论课件.pptx VIP
- (正式版)G-B∕T 43896-2024 金属材料 超高周疲劳 超声疲劳试验方法.docx VIP
- 2025年教练员考试试卷及答案.doc VIP
- 雨课堂学堂在线《工程伦理(北京航空航天)》学堂云单元测试考核答案.pdf
- 博电继电保护测试仪用户手册..pdf VIP
- 《银屑病慢病管理专家共识(2025版)》解读PPT课件.pptx VIP
- 2023年南京学时继续教育专业课《数字经济工程(2)》课后作业(答案全).pdf VIP
原创力文档


文档评论(0)