- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
采购经理英文简历
采购经理英文简历在求职中能不能成功,还有一个非常重要影
响因素,那就是简历的投递。投递个人简历很有讲究,一方面要注意
投递的时间,要在对方招聘的期间。 另一方面则要注意投递的方式,
不同的投递方式需要注意的要点也不同。如果简历投递没有把握好,
错过了用人单位筛选的时间,那也就预示着失败。
采购经理英文简历篇一:
Nationality:China (Mainland)
Current Place:Dongguan
Height/Weight:155 cm?55 kg
Marital Status:married
Age:36 years
Career Objective
Application type:Jobseeker
Preferred job title:Dynamic/Energy/Mineral: Purchasing
Manager 、 Senior Management: PMC Manager 、
Manufacture/Operation: Supply Chain Manager Working life:11Title:No title
Job type:Full timeExpected Start date:In a month
Expected salary: ¥ 8 , 000-- ¥ 12 , 000Preferred working place:Guangdong province Henan Hubei
Work experience
Companys name:Areva Disconnector(Guangdong) Co.,LtdBegin and end date: 2008-01-
Enterprise nature:Soly foreign funded enterprisesIndustry:
Communication/Telecom/Network Equipment
Job Title: Procurement Manager
Job description: 1.Organise all the raw materialPlant equipment purchasing.
2.Build up all the purchasing/Logistic process.
3.Take charge in localisation job.
Achievements:Save 10M RMB during below action:
1.Complete taxduty free within a very short lead time.
2.Find proper local equipment supplier to get better service/lower
price.
3.Set up proper logistic project to build/improve the whole supply chain.
4.Support to localisation project.
Reasons for leaving: Working place is too far away from home
Companys name:Dongguan Elcoteq Co.,LtdBegin and end date:
2005-12-2007-12
Enterprise nature:Soly foreign funded enterprisesIndustry:
Mechanics/Electrical Equipment/Heavy Industry
Job Title: Planning Supervisor
Job description: 1.Make mid-long term plan base on customer
demandsupply status,
2.Once cap conflict in midseason, as coordinator with different department; Maximize cap utilization
3.KPI monthly reviewindividual performance monitor
4.Direct HC control.
5.Continuously push DSCM to improve in a systematic way Reasons for leaving: Individual Development
Companys name:Dongguan Molex Co.,LtdBegin and end date:
2002-09
文档评论(0)