- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施
工
组
织
总
设
计
××××建设集团公司编
目 录
精品 word 文档 值得下载 值得拥有
一、工程概况 ·····························································(3)
1、工程构成概况 ·························································(3)
2、建筑项目的建设、设计和施工单位 ······························(3)
3、建设地区自然条件概况 ·············································(5)
二、施工部署 ·····························································(7)
1、项目组织机构形式 ···················································(7)
2、总施工顺序安排 ······················································(8)
3、总项目工期目标 ······················································(9)
三、全场性施工准备工作计划 ········································(9)
1、“三通一平”工作 ····················································(9)
2、临时设施计划 ·························································(9)
3、技术工作准备 ·······················································(12)
四、施工总进度计划 ··················································(13)
五、施工总平面布置 ··················································(14)
六、主要项目施工方案 ···············································(16)
1、土方开挖 ·····························································(16)
2、地下室基坑支护 ····················································(16)
3、模板支撑及用料 ····················································(17)
4、钢筋安装及焊接 ······
文档评论(0)